Knights were appointed by James Industrial Limited (JIL), a national industrial site developer, to install a new concrete floor in some historic industrial buildings in Prestatyn that were being completely repurposed.
Knights were appointed by James Industrial Limited (JIL), a national industrial site developer, to install a new concrete floor in some historic industrial buildings in Prestatyn that were being completely repurposed.
In 2017, Knights Construction Group were appointed by the owners of Santa Pod Raceway to embark on a major resurfacing project, designed to reinstate its status as the leading drag racing track in Europe...