Past Projects

IMG_20230418_161247

Crown Paint Ltd

Knights were appointed by James Industrial Limited (JIL), a national industrial site developer, to install a new concrete floor in some historic industrial buildings in Prestatyn that were being completely repurposed.
PHOTO-2024-04-24-11-35-05

James Industrial Limited​: Warren Drive

Knights were appointed by James Industrial Limited (JIL), a national industrial site developer, to install a new concrete floor in some historic industrial buildings in Prestatyn that were being completely repurposed.
santapod-raceway-project-thumbnail

Santa Pod Raceway

In 2017, Knights Construction Group were appointed by the owners of Santa Pod Raceway to embark on a major resurfacing project, designed to reinstate its status as the leading drag racing track in Europe...